Kentus
Pilot Program · 2027

Tell us how
your mine runs.

We’re building Kentus to move crews on battery for a full shift, and to take the cost of diesel out with it: fuel, fumes, brake jobs, downtime, and ventilation. Walk us through your needs, and we’ll discuss how we can help.

Built Around Your Mine

Mining duty, underground or surface, tailored to your operation.

  • Site geometry & grades
  • Shift length & duty cycle
  • Crew-change pattern & fleet
  • Your internal requirements
What We're Proposing
01
Cost

What diesel really costs

Fuel is the biggest cost. Add your idle hours, brake wear on loaded descents, and the diesel particulate your crews breathe in. Kentus goes after all of it.

02
Reliability

A full shift, with room to spare

The battery is bigger than this vehicle needs, on purpose. It's sized to run multiple complete shifts with margin, so nobody pulls it off the job to charge. Give us your shift length and duty cycle and we'll walk you through the numbers.

03
Standard

Standard platform, fitted to you

One standard platform with FOPS and ROPS across the full crew envelope. We verify dimensions, battery, and configurations against your needs. Safety is non-negotiable.

04
First step

A working call with the people building the vehicle

The first conversation is with the engineers building Kentus, not a sales team. You walk us through how your mine runs, and we'll see how we can help.

Start the Conversation

We'd like to hear from you.

Tell us how your operation runs: site geometry, shift pattern, the diesel units you want rid of, or anything else is also welcome.

Location Chatham-Kent, Ontario